Before digitization, entry approvals and registrations required manual handling.
- The Challenge
- The Solution
Large-scale waste-to-energy facilities like Shoualah manage a constant flow of contractors, vendors, and visitors in a highly regulated, safety-critical environment. Without a fully digital visitor and gate pass system, access control, compliance, and visibility become operational risks rather than controlled processes.
Manual visitor and contractor registration causing gate delays
Difficulty verifying safety training and certifications in real time
Limited visibility of who is on-site at any given moment
Gate congestion during peak entry and maintenance periods
Inconsistent approval workflows across departments
High dependency on security staff for manual decision-making
Visitor & Gatepass Management
A fully digital contractor and visitor management workflow that replaces manual paperwork, automates safety compliance, and accelerates secure access, ensuring every individual entering the facility is verified, trained, and approved without operational delays.
Digital pre-registration and approval for visitors and contractors
Automated safety induction and certification verification (HSE Induction)
QR-based digital gate passes for fast, contactless entry
Real-time visibility of all on-site personnel
Role-based and zone-based access control
Standardized approval workflows across departments
Faster gate processing with reduced security dependency
Centralized audit-ready logs and compliance reports
Seamless handling of repeat contractors with saved profiles
Complete digital traceability for incidents and investigations
Impactful Results
Visitor Loging
Visitor & Material Gate Pass
Returnable & Non Returnable Items
97%
Improved Overall Operational Speed
Why Entry2Exit?
Teams had to manually verify if each contractor completed the required safety steps.
Real-time tracking of visitors and contractors was difficult during busy operations.
Checking IDs, licenses, and permits manually led to delays.
Manual check-in caused queues at entry points.
Gate passes were stored in different places, causing confusion.
Ensuring contractors completed safety induction required manual confirmation.
Testimonial
Client Feedback
- List Item #1
- List Item #1
- List Item #1
- List Item #1
- List Item #1

Jacob Kurien
IT Engineer, Shoualah